2009年5月25日,ODE S.r.l报名参加2009亚洲国际动力传动与控制技术展览会暨国际压缩空气技术展览会。
展品:电磁阀及相关产品
21X2KT
S.V. with pilot control for interception of fluids compatible with the construction materials.
A minimum operational pressure of 0,5 bar is required.
The materials used and the tests carried out ensure maximum reliability and duration.
USE: Hot Water, Chemistry, Steam (180°C).
21Z16
Direct acting S.V., producing no turbulences, for interception of fluids compatible with the pipe materials
Minimum operational pressure is not required.
This S.V. allow bidirectional flow and avoid any dead space. The materials used and the tests carried out ensure maximum reliability and duration.
USE: Automation, Analysis And Medical
21Z25
Direct acting S.V., producing no turbulences, for interception of fluids compatible with the pipe materials. Minimum operational pressure is not required.
This S.V. allow bidirectional flow and avoid any dead space. The materials used and the tests carried out ensure maximum reliability and duration.
USE: Automation, Coffee Machine, Analysis And Medical
31A1A
Direct acting S.V. for interception of fluids compatible with the construction materials.
Minimum operational pressure is not required.
The materials used and the tests carried out ensure maximum reliability and duration.
USE: Hot water, Steam (180°C), Professional coffee machine
31JN1W
Direct acting S.V. for interception of fluids compatible with the construction materials.
Minimum operational pressure is not required.
The materials used and the tests carried out ensure maximum reliability and duration.
USE: Automation, Heating. Coffee
31Z30
Direct acting S.V., producing no turbulences, for interception of fluids compatible with the pipe materials. Minimum operational pressure is not required.
This S.V. allow bidirectional flow and avoid any dead space. The materials used and the tests carried out ensure maximum reliability and duration.
USE: Automation, Coffee Machine Analysis And Medical
21A1KR
Direct acting S.V. for interception of fluids compatible with the construction material.
Minimum operational pressure is not required.
The materials used and the tests carried out ensure maximum reliability and duration.
USE: Hot water, Heating Steam (180°C)
21A1KV
Direct acting S.V. for interception of fluids compatible with the construction materials.
Minimum operational pressure is not required.
The materials used and the tests carried out ensure maximum reliability and duration.
USE: Automation, Heating
21A2K0T
Direct acting S.V. for interception of fluids compatible with the construction materials.
Minimum operational pressure is not required.
The materials used and the tests carried out ensure maximum reliability and duration.
USE: Automation.
21A5KT
Direct acting S.V. for interception of fluids compatible with the construction materials.
Minimum operational pressure is not required.
The materials used and the tests carried out ensure maximum reliability and duration. USE: Automation, Heating
21D72KR
Directing acting S.V. for automatic drink dispensers.
Minimum operational pressure is not required.
The material used and the tests carried out ensure maximum reliability and duration.
USE: Automatic Drink Dispenser
21H7KV
S.V. with pilot control for interception of fluids compatible with the construction materials.
A minimum operational pressure of 0,1 bar is required.
The materials used and the tests carried out ensure maximum reliability and duration.
USE: Automation, Heating.
21L1K1T
Direct acting S.V. for interception of fluids compatible with the construction materials.
Minimum operational pressure is not required.
The materials used and the tests carried out ensure maximum reliability and duration.
reliability and duration.
USE: Chemistry, Drinks.
21PW3F0
S.V. with pilot control for interception of fluids compatible with the construction materials.
A minimum operational pressure of 0,5 bar is required.
The materials used and the tests undertaken ensure maximum reliability and duration.
These solenoid valves are not suitable for stagnating fluids, or for fluids that being subject to evaporation may deposit solid, calcareous or similar residues.
USE: Automation, Compressors, Heating.
21W3K
S.V. with pilot control for interception of fluids compatible with the construction materials.
A minimum operational pressure of 0,2 bar is required.
The materials used and the tests carried out ensure maximum reliability and duration. USE: Automation, Heating, Water control
21WA4
S.V. with pilot control for interception of fluids compatible with the construction materials.
A minimum operational pressure of 0,2 bar is required.
The materials used and the tests carried out ensure maximum reliability and duration.
USE: Automation, Heating, Water control